ccare1
ccare2
ccare3
ccare4
ccare1 thumbnail
ccare2 thumbnail
ccare3 thumbnail
ccare4 thumbnail

Location
San Diego, CA

Project Size / Type
9,300SF Tenant Improvement

Team

Smith Consulting Architects
Architect

Lusardi Construction
General Contractor

Awards & Recognition

cCARE Cancer Treatment Center, 4S Ranch

Project Overview

Michael Wall Engineering provided electrical construction documents for the 9,300SF single-story Cancer Treatment Center for cCARE Associates located in the 4S Ranch Medical Plaza.  The project consisted of medical exam rooms, a PET/CT scanner room, a high-energy linear accelerator room for radiation treatments, a chemo-therapy treatment room, consultation suites, a waiting room and administrative offices. Included in the scope of work was an 800A 480Y/277V 3 Phase 4 Wire electrical service and a 112.5 kVA power isolation transformer for the linear accelerator to generate clean power. Additionally, a 75 kVA clean power distribution unit was provided for the PET/CT scanner to mitigate harmonic frequencies disturbance.  Energy efficient lighting, including motion sensors, dimming capability and a lighting control panel, were designed in compliance with Title 24 requirements.