D6810
D6905
J0634
nD6988
nJ0652
D6810 thumbnail
D6905 thumbnail
J0634 thumbnail
nD6988 thumbnail
nJ0652 thumbnail

Location
Murrieta, CA

Project Size / Type
33,000SF Built-to-Suit

Team

Ferguson Pape Baldwin Architects
Architect

Jaynes Corp
General Contractor

City of Murrieta - City Hall & Town Square

Project Overview

Michael Wall Engineering provided electrical engineering for this new $24M 33,700SF 2-story City Hall building with includes a 120-seat Council Chamber, offices, public space, and administrative space.  The building features a 2500A 208Y/120V main service with a 125kW diesel generator to support life-safety loads and a 325SF computer room.  The computer room houses all City networking equipment and features a dedicated HVAC system, fire suppression system, and a 40kW UPS.  Michael Wall Engineering designed the voice/data system for the project, which features gigabit copper Ethernet and multimode fiber to each of the 200 workstations.  Additional designs include a sophisticated audio/video system and dimming system intended for television broadcasts, and specialized exterior lighting design for the public areas.