Intuit-1-(1)
Intuit-1-(2)
Intuit-1-(3)
Intuit-1-(4)
Intuit-1-(1) thumbnail
Intuit-1-(2) thumbnail
Intuit-1-(3) thumbnail
Intuit-1-(4) thumbnail

Location
San Diego, CA

Project Size / Type
450,000SF Built-to-Suit

Team

Kilroy Realty Corp
Developer

Architects Hanna Gabriel Wells
Architect

Reno Contracting
General Contractor

 

Awards & Recognition
LEED Gold Certification

Intuit Headquarters

Project Overview

Intuit Headquarters is located at the San Diego Campus at Kilroy Santa Fe Summit and is a four building 450,000SF LEED Gold project that includes an above grade parking structure of approximately 396,000SF. Building 1 consists of 107,012 GSF, Buildings 2 and 3 equal 134,400 GSF each, and Building 4 is 104,188 GSF.

The site includes plazas, sport areas, walking trails, large gathering spaces, barbeque, fountains, and significant landscape lighting. The building interiors include administration, training, IT, electronic labs, full service cafeteria, fitness center with lockers and showers, and other ancillary space.

The lighting system was designed for extreme efficiency, achieving an energy budget more than 30% below Title 24. The system saves Intuit over $150,000 per year in energy costs when compared with standard lighting systems. Each building is served by a 4000A 480Y/277V electric service. The laboratories feature over 300 feet of overhead busway system for ease of equipment modifications.