Michael Wall Engineering
Michael Wall Engineering
About us
Services
Projects
Careers
Contact us
Home

 

 

 

 

 

 

 

 

 
Projects
 

Intuit
Regional Headquarters

San Diego, California

  LEED Gold: In Review

Click to enlarge.
Click To Enlarge Click To Enlarge Click To Enlarge Click To Enlarge Click To Enlarge Click To Enlarge Click To Enlarge Click To Enlarge

 

Michael Wall Engineering, Inc. provided electrical construction documents for Intuit's four building, $80 million, 460,000SF San Diego Campus at Kilroy Santa Fe Summit. The project includes an above grade parking structure of approximately 396,000SF. Site amenities include plazas, sport areas, walking trails, large gathering spaces, barbeque, fountains, and significant landscape lighting. The building interiors include administration, training, IT, electronic labs, full service cafeteria, fitness center with lockers and showers, and other ancillary space. The lighting system was designed for extreme efficiency, more than 16% below Title 24, and saves Intuit over $150,000 per year in energy costs when compared with standard lighting systems. The facility is designed to be LEED Gold certified. Each building is served by a 4000A 480Y/277V electric service, and the laboratories feature over 300 foot of overhead busway system for ease of equipment modifications.

Awards:
International Illumination Design Awards (IIDA)
2008 People’s Choice Interior Lighting Design Award
International Interior Design Awards
2008 Southern California Chapter Nominee
Interior Design Magazine
2007 Best of Year Award for Architectural Lighting

Specialized Engineering:
$80 Million Overall Project Budget
1250kW Standby Generator
600kVA UPS System
LEED Gold Certification: In Review
460,000SF Office
396,000SF Parking
High Efficiency Lighting Design

Project Owner:
Kilroy Realty Corporation

Shell Architect:
Hanna Gabriel Wells

T.I. Architect:
Carrier Johnson

Construction Manager:
Integrated Project Management


Return to Projects