| The Mark
San Diego, California

Click to enlarge.
Michael Wall Engineering, Inc. provided electrical construction documents for this 4-building residential complex. The main structure is a 32-story high rise residential condominium tower, which houses 229 one- and two-bedroom condos and 13 penthouse suites. The other 3 buildings are 2-story residential townhouse structures. A central courtyard and common area add a park-like setting to this downtown development. Also included in the 360,000SF complex are 10,000SF of commercial areas on the first floor of the outlying structures on 8th Avenue and Market Street, and a 4-level underground parking structure. A 600kW/750kVA standby diesel generator was designed. Two (2) 4000A electrical services were included for the residential units, commercial, and common areas.
Specialized Engineering:
360,000SF Complex
600kW Backup Power Generation Capability
Two (2) 4000A Electrical Services
4-Level Underground Parking Structure
General Contractor:
Hensel Phelps
Architect:
Martinez & Cutri Architecture
Electrical Contractor:
Dynalectric
Return to Projects
|