| Naval Air Station
Integrated Maintenance Hangars
Lemoore, California

Michael Wall Engineering, Inc. produced electrical construction documents for this $10 million, design-build project included adding two hangars totaling 28,000SF. Included in the design were aircraft tow-ways, site lighting, fire alarm, fire sensing and suppression systems.
General Contractor:
Harper Construction
Electrical Contractor:
Bergelectric
Architect:
Cass Sowatsky Chapman
Return to Projects
|