![office-sempra-hd](https://www.mwalleng.com/wp-content/uploads/2020/03/office-sempra-hd-1024x493.jpg)
Michael Wall Engineering produced design-build electrical construction documents for the 330,000SF Cisterra Tower located in downtown San Diego, CA. The project consisted of a 16-story warm shell Class A office building with 3 stories of underground parking and 3 stories of above grade parking (485 spaces).
![office-sempra-1](https://www.mwalleng.com/wp-content/uploads/2020/03/office-sempra-1.jpg)
The building was planned for use solely by a single tenant (Sempra Energy) with the first 3 floors used for the main lobby and for corporate amenity space. The project was constructed using a build-to-suit delivery and was awarded LEED Gold for New Construction.
Owner
Cisterra
Location
San Diego, CA
Project Type
Office
Size
$120 Million
330,000SF
Class A Office Tower
16 Stories
Team
Carrier Johnson + CULTURE
Recognition
2016 Orchid People’s Choice Award, San Diego Architectural Foundation
2015 San Diego Partnership Alonzo Award Winner, Downtown San Diego Partnership
![office-sempra-2](https://www.mwalleng.com/wp-content/uploads/2020/03/office-sempra-2.jpg)
![office-sempra-3](https://www.mwalleng.com/wp-content/uploads/2020/03/office-sempra-3.jpg)
![office-sempra-04](https://www.mwalleng.com/wp-content/uploads/2020/03/office-sempra-04.jpg)